6 Longridge Lane, UB1 3JH
Work to an existing home, 2-storey
Ealing · Reference 253589FUL
Comment period closed
What is being proposed
Construction of two storey 2-bedroom dwelling; two storey rear extension, part single storey front extension, new exterior insulation (no.6)
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Daylight and overshadowing
- Overlooking and loss of privacy
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
22 Sept 2025 · Submitted to the council
Validated
22 Sept 2025 · Checked and published
Comments close
23 Oct 2025 · Last day to have your say
Decision due
17 Nov 2025 · Target date, often slips
Decided
12 Mar 2026 · Outcome published
Key facts
- Reference
- 253589FUL
- Authority
- Ealing
- Address
- 6 Longridge Lane, UB1 3JH
- Postcode
- UB1 3JH
- Type
- Extension or home alteration
- Scale
- Minor
- Storeys
- 2
- Applicant
- Not published
- Agent
- Not published
- Received
- 22 Sept 2025
- Decision due
- 17 Nov 2025
Also happening nearby
6 Longridge Lane, UB1 3JH
A change of use
Details of the Acoustic Specification pursuant to condition 4 of planning permission 250214FUL dated 21.11.2025 for 'Conversion of single dwellinghouse into 4 bed HMO for up to 7 persons; front porch extension ; single storey rear extension (following demolition of existing conservatory; alteration of roof from hip to gable end; rear roof extension, first floor rear extension and installation of two rooflights to front roofslope; two side dormer roof extensions to existing first floor outrigger extension and associated external alterations'
Comment period closed