What is being proposed
Details of a Tree Monitoring Plan pursuant to condition 17 (part discharge - part a) of planning permission ref: 250949FUL dated 19/12/2025 for: Site clearance and preparation, including demolition of all existing buildings on site and redevelopment of the site to provide: Construction of four data centre units within three buildings of approximately 67.9m AOD in height (Use Class B8, approximately 158,702sqm GEA), four industrial buildings ranging from approximately 41.3m to 46.2m AOD in height (Use Classes B8, B2 and E(g)(iii), approximately 23,389 GEA), central pavilion building of approximately 35m AOD in height (Use Class E(b), approximately 223 GEA), two substations (38.05m AOD in height), associated plant, enclosures and necessary physical security systems, internal roads, servicing, circulation, car and cycle parking and hard and soft landscaping works.
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Noise and disturbance
- Parking pressure
- Traffic and access
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
25 Feb 2026 · Submitted to the council
Validated
25 Feb 2026 · Checked and published
Comments close
18 Mar 2026 · Last day to have your say
Decision due
22 Apr 2026 · Target date, often slips
Decided
9 Apr 2026 · Outcome published
Key facts
- Reference
- 260925CND
- Authority
- Ealing
- Address
- International Trading Estate, Trident Way, UB2 5LF
- Postcode
- UB2 5LF
- Type
- Industrial or storage
- Scale
- Major
- Applicant
- Not published
- Agent
- Not published
- Received
- 25 Feb 2026
- Decision due
- 22 Apr 2026
Also happening nearby
International Trading Estate, Trident Way, UB2 5LF
An industrial or storage scheme · counts as major development, so consultation is wider and the decision takes longer
Details of Reducing Emissions from Demolition and Construction Plan part pursuant to condition 15 (part discharge - Phase 1) of planning permission ref: 250949FUL dated 19/12/2025 for: Site clearance and preparation, including demolition of all existing buildings on site and redevelopment of the site to provide: Construction of four data centre units within three buildings of approximately 67.9m AOD in height (Use Class B8, approximately 158,702sqm GEA), four industrial buildings ranging from approximately 41.3m to 46.2m AOD in height (Use Classes B8, B2 and E(g)(iii), approximately 23,389 GEA), central pavilion building of approximately 35m AOD in height (Use Class E(b), approximately 223 GEA), two substations (38.05m AOD in height), associated plant, enclosures and necessary physical security systems, internal roads, servicing, circulation, car and cycle parking and hard and soft landscaping works.
Comment period closed