130 Acton Works, Bollo Lane, W3 8QU
A planning application · counts as major development, so consultation is wider and the decision takes longer
Ealing · Reference 262662CND
Comment period closed
What is being proposed
Submission of a Landscape Management Plan pursuant to Condition 20 of planning permission ref: 243527VAR dated 27.06.2025 for 'Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Boundaries and garden amenity
- Traffic and access
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
3 Jul 2026 · Submitted to the council
Validated
3 Jul 2026 · Checked and published
Comments close
10 Aug 2026 · Last day to have your say
Decision due
28 Aug 2026 · Target date, often slips
Decided
Not yet · Outcome published
Key facts
- Reference
- 262662CND
- Authority
- Ealing
- Address
- 130 Acton Works, Bollo Lane, W3 8QU
- Postcode
- W3 8QU
- Type
- Other
- Scale
- Major
- Homes proposed
- 424
- Storeys
- 25
- Applicant
- Not published
- Agent
- Not published
- Received
- 3 Jul 2026
- Decision due
- 28 Aug 2026
Also happening nearby
65 Ivy Crescent, W4 5NG
Work to an existing home, single-storey
Single storey rear extension (following demolition of existing); replacement windows and external doors; rear roof extension and installation of front rooflight
Comment period closed