Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Greenwich · Reference 25/3952/NM
What is being proposed
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow:Design alterations to the central circulation core to comply with fire regulations;Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios.Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms.Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O.Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade.Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing.Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15.Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Description as published by Greenwich.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Overlooking and loss of privacy
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
25 Nov 2025 · Submitted to the council
Validated
25 Nov 2025 · Checked and published
Comments close
Not yet · Last day to have your say
Decision due
9 Jan 2026 · Target date, often slips
Decided
9 Jan 2026 · Outcome published
Key facts
- Reference
- 25/3952/NM
- Authority
- Greenwich
- Address
- Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
- Postcode
- SE10 0PF
- Type
- Conditions and amendments
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 25 Nov 2025
- Decision due
- 9 Jan 2026
Also happening nearby
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: No increases to the overall height of the building or number of floors but clarification on the floor numbers to remove reference to mezzanines.Alterations to the building envelope, increasing by one full brick on all sides.Increase in Student rooms from 340 to 353;Increased number of accessible bedrooms/studios to meet requirements for inclusive design as required by condition 69.Reduction in cycle parking ratio from 0.75 spaces per bed to 0.5 spaces per bed resulting in 177 spaces for students, 4 no. spaces for staff, 10 e-bike spaces, and 9 no. external spaces for visitors.Internal alterations to cycle store locations and plant rooms spaces on levels 1, 2 and 3.Introduced green roof and external terrace on proposed level 3 for students with relocation of generator now placed internally within the building at level 1.Owing to the changes highlighted above and requested alterations to the wording to condition 68, the following conditions 2 (approved drawings), 3 (quantum of development), 4 (quantum of development - height of buildings and floorspace), 54 (Fire Statement), 58 (Green/Brown Roofs and Walls) and 68 (Habitat Management and Monitoring Plan) will require amendments.