14 Cresswell Place, LONDON, SW10 9RD
A planning application
Kensington and Chelsea · Reference PP/25/05566
Comment period closed
What is being proposed
Provision of AC condenser unit in acoustic housing with timber screens on the rear roof of first floor; replacement of entrance door and addition of new front portico
Description as published by Kensington and Chelsea.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Overlooking and loss of privacy
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
12 Sept 2025 · Submitted to the council
Validated
12 Sept 2025 · Checked and published
Comments close
17 Oct 2025 · Last day to have your say
Decision due
Not yet · Target date, often slips
Decided
7 Nov 2025 · Outcome published
Key facts
- Reference
- PP/25/05566
- Authority
- Kensington and Chelsea
- Address
- 14 Cresswell Place, LONDON, SW10 9RD
- Postcode
- SW10 9RD
- Type
- Other
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 12 Sept 2025
- Decision due
- Not given
Also happening nearby
15 The Boltons, LONDON, SW10 9TD
Work to a listed building
DOCUMENTS AND DRAWINGS ARE NOT AVAILABLE ELECTRONICALLY FOR THIS APPLICATION. PLEASE CALL THE CASE OFFICER. Details required by Condition 3(m) (Submission of details - locations of new skirtings, cornices and other decorative features including ceiling details) and 3(n) (Submission of details - skirtings, architraves, plinth, cornices, wall mouldings, dado and picture rails, ceiling mouldings) of listed building consent LB/24/05013 (Proposed internal alterations following approval of listed building consent LB/23/07421 to comprise: Lower Ground Floor: 1. Minor changes to internal door openings in LG.20 Shower Room. 2. Minor changes to internal door openings in LG.01 Gym. 3. Minor changes to internal door openings in LG.17 Storage. Ground Floor: No Changes. First Floor: 1. Minor changes to internal door opening into F.08 En-Suite 02. Second Floor: 1. Layout change in Guest Suite 3 and En-Suite 5. Third Floor: 1. Location of door opening changed in T.01 Staff Bedroom. 2. Minor changes to internal door openings into T.06 Powder Room. 3. Configuration of joinery and door openings into T.08 Storage. 4. Configuration of joinery and door openings into T.09 Storage)
Comment period closed