11 DEVELOPMENT AT 11, MALFORD GROVE, London
An energy scheme
Redbridge · Reference 1281/26
Comment period closed
What is being proposed
Demolish bungalow. Erection of two (two x 4-bed) semi-detached dwellings with associated amenity space, landscaping, car parking, EV charging points, cycle and waste storage. Formation of means of access to a highway. (summary)
Description as published by Redbridge.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Parking pressure
- Boundaries and garden amenity
- Traffic and access
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
5 Jun 2026 · Submitted to the council
Validated
5 Jun 2026 · Checked and published
Comments close
4 Jul 2026 · Last day to have your say
Decision due
30 Jul 2026 · Target date, often slips
Decided
Not yet · Outcome published
Key facts
- Reference
- 1281/26
- Authority
- Redbridge
- Address
- 11 DEVELOPMENT AT 11, MALFORD GROVE, London
- Postcode
- Not given
- Type
- Energy
- Scale
- Medium
- Applicant
- Not published
- Agent
- Not published
- Received
- 5 Jun 2026
- Decision due
- 30 Jul 2026
Also happening nearby
DEVELOPMENT AT RINGSTEAD, HERMITAGE WALK
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Variation of Condition 2 of approved planning permission 2911/25: adjustments to the front driveway; boundary wall, pillars and entrance gates; a marginal reduction in the width of the front elevation and a reduction in the main roof ridge height; revisions to the internal layout at ground, first and loft floor levels, including removal of the double height void; alterations to window and door positions, sizes and styles, including the addition and omission of openings; removal of the central loft dormer; minor dimensional updates to separation distances; refinements to elevational detailing and material distribution, including the replacement of some rendered areas with brick; and amendments to ceiling and floor-to-floor heights. (Summary).
Comment period closed