157 Site at 157 - 167 Malcolm Place, London, E2 0EU
A change of use
Tower Hamlets · Reference PA/25/01835/NC
Comment period closed
What is being proposed
Change of use of railway arches to flexible Use Class E and B8, associated external alterations and erection of sub-stationMinor Material Amendments to Planning permission Ref: PA/22/02494, Dated 15/11/2023Amendments include: Condition 2 (Approved drawings), 3 (External and internal facing materials), 7(Travel Plan), 8(Deliveries and Servicing Plan), 9(Site Waste Management Plan), 10 (Scheme of Highway Improvement) and 11 (Energy statement)
Description as published by Tower Hamlets.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Character of the area
- Traffic and access
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
15 Oct 2025 · Submitted to the council
Validated
15 Oct 2025 · Checked and published
Comments close
5 Dec 2025 · Last day to have your say
Decision due
29 Apr 2026 · Target date, often slips
Decided
29 Apr 2026 · Outcome published
Key facts
- Reference
- PA/25/01835/NC
- Authority
- Tower Hamlets
- Address
- 157 Site at 157 - 167 Malcolm Place, London, E2 0EU
- Postcode
- E2 0EU
- Type
- Change of use
- Scale
- Medium
- Applicant
- Not published
- Agent
- Not published
- Received
- 15 Oct 2025
- Decision due
- 29 Apr 2026
Also happening nearby
157 Site at 157 - 167 Malcolm Place, London, E2 0EU
Work to a listed building
Listed Building Consent for the proposed minor-material amendments: Re-design of the front infills to incorporate glazed retail frontage in Arches 157-159; New insulated floor slab in Arches 157 and 158; New blockwork internal walls to the rear of Arches 157-160 with respective lining and pea shingle borders; Repositioning of internal WC pods; and Conversion of Arch 167 into a communal bin store with new front infill constructed of English bond brickwork with steel double doors and ventilation panels.
Comment period closed