7 Pier Head, Wapping High Street, London, E1W 1PN
An energy scheme
Tower Hamlets · Reference PA/26/01358/NC
What is being proposed
Comprehensive refurbishment of existing building, including internal and external restoration works. Replacement and part replacement of timber sash windows, including installation of slim double-glazed units. Erection of single storey lower ground rear extension. Alterations to existing boundary wall to communal passage at lower ground level. Replace existing external gate to communal passage. Installation of two air source heat pumps on the existing area of flat roof.
Description as published by Tower Hamlets.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Daylight and overshadowing
- Overlooking and loss of privacy
- Parking pressure
- Boundaries and garden amenity
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
11 Aug 2026 · Submitted to the council
Validated
11 Aug 2026 · Checked and published
Comments close
Not yet · Last day to have your say
Decision due
Not yet · Target date, often slips
Decided
Not yet · Outcome published
Key facts
- Reference
- PA/26/01358/NC
- Authority
- Tower Hamlets
- Address
- 7 Pier Head, Wapping High Street, London, E1W 1PN
- Postcode
- E1W 1PN
- Type
- Energy
- Scale
- Medium
- Storeys
- 1
- Applicant
- Not published
- Agent
- Not published
- Received
- 11 Aug 2026
- Decision due
- Not given
Also happening nearby
7 Pier Head, Wapping High Street, London, E1W 1PN
An energy scheme
Comprehensive refurbishment of existing building, including internal and external restoration works. Replacement and part replacement of timber sash windows, including installation of slim double-glazed units. Erection of single storey lower ground rear extension. Alterations to existing boundary wall to communal passage at lower ground level. Replace existing external gate to communal passage. Installation of two air source heat pumps on the existing area of flat roof.