32, 34, Woodfield Road, W9 2BE
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Westminster · Reference 25/06395/FULL
Comment period closed
What is being proposed
Variation of condition 1 of planning permission dated 8th September 2023 (RN:23/01171/FULL) for the Alterations and extensions, including the infilling of the front yard with a three storey extension with ground floor servicing bay, single storey extension over existing building, and lift and stair core to provide access to new roof terrace at third floor level; installation of PV panels on roof; installation of green roof; installation of mechanical plant equipment at rear first floor level; all in association with the extension to the existing community use and provision of a new co-working office space at second floor level (Use Class E). Namely, changes to staircore and lift overrun, change to cladding, alterations to the roof edge profile, changes to the cladding to the stair and lift core access, removal of canopy, enlarged sign, alterations to the windows and entrance door and amendments to loading bay door.
Description as published by Westminster.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Daylight and overshadowing
- Noise and disturbance
- Overlooking and loss of privacy
- Traffic and access
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
8 Sept 2025 · Submitted to the council
Validated
8 Sept 2025 · Checked and published
Comments close
13 Oct 2025 · Last day to have your say
Decision due
3 Nov 2025 · Target date, often slips
Decided
4 Nov 2025 · Outcome published
Key facts
- Reference
- 25/06395/FULL
- Authority
- Westminster
- Address
- 32, 34, Woodfield Road, W9 2BE
- Postcode
- W9 2BE
- Type
- Conditions and amendments
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 8 Sept 2025
- Decision due
- 3 Nov 2025
Also happening nearby
32, 34, Woodfield Road, W9 2BE
An energy scheme
Installation of air-source heat pump and condenser units within an acoustic enclosure and associated works at roof level.
Comment period closed