3, 6, Kenrick Place, W1U 6HD
Work to an existing home
Westminster · Reference 26/01390/FULL
Comment period closed
What is being proposed
Erection of new rear dormer, refurbishment of the existing windows (excluding the ground floor shopfront glazing to No. 6 Kenrick Place) with new painted timber framed double glazed units, replacement of glazed roof lantern with a new metal framed roof lantern, installation of four new condenser units at roof level, installation of timber doors and Juliet balcony railing to front elevation, installation of two rooflights to the west facing pitched roof, installation of frosted manifestation film to a small number of west elevation window panes and installation of access door, safety balustrading and safety access walkway at roof level.
Description as published by Westminster.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Character of the area
- Overlooking and loss of privacy
- Traffic and access
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
4 Mar 2026 · Submitted to the council
Validated
4 Mar 2026 · Checked and published
Comments close
21 Apr 2026 · Last day to have your say
Decision due
29 Apr 2026 · Target date, often slips
Decided
29 Apr 2026 · Outcome published
Key facts
- Reference
- 26/01390/FULL
- Authority
- Westminster
- Address
- 3, 6, Kenrick Place, W1U 6HD
- Postcode
- W1U 6HD
- Type
- Extension or home alteration
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 4 Mar 2026
- Decision due
- 29 Apr 2026
Also happening nearby
3, 6, Kenrick Place, W1U 6HD
Work to an existing home
Amendments to planning permission dated 29 April 2026 (26/01390/FULL) for: Erection of new rear dormer, refurbishment of the existing windows (excluding the ground floor shopfront glazing to No. 6 Kenrick Place) with new painted timber framed double glazed units, replacement of glazed roof lantern with a new metal framed roof lantern, installation of four new condenser units at roof level, installation of timber doors and Juliet balcony railing to front elevation, installation of two rooflights to the west facing pitched roof, installation of frosted manifestation film to a small number of west elevation window panes and installation of access door, safety balustrading and safety access walkway at roof level namely, updated Environmental Noise Survey and HVAC Plant Noise Impact Analysis' report document with version 4.0 (dated 3rd August 2026).