Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Ealing · Reference Ealing/261853CND
Comment period closed
What is being proposed
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Drainage and flood risk
- Loss of open space
- Parking pressure
- Boundaries and garden amenity
- Traffic and access
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
5 May 2026 · Submitted to the council
Validated
5 May 2026 · Checked and published
Comments close
22 May 2026 · Last day to have your say
Decision due
30 Jun 2026 · Target date, often slips
Decided
21 Aug 2026 · Outcome published
Key facts
- Reference
- Ealing/261853CND
- Authority
- Ealing
- Address
- Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
- Postcode
- W13 0AL
- Type
- Conditions and amendments
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 5 May 2026
- Decision due
- 30 Jun 2026
Also happening nearby
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
A planning application · counts as major development, so consultation is wider and the decision takes longer
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.