TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
A planning application
Ealing · Reference Ealing/262319CND
Comment period closed
What is being proposed
Details of Solar Glare pursuant to Condition 16 of planning permission ref: 243527VAR dated 26th June 2025 in so far as it relates to the Phase 2 Enabling and Construction only
Description as published by Ealing.
Timeline
Received
9 Jun 2026 · Submitted to the council
Validated
9 Jun 2026 · Checked and published
Comments close
30 Jun 2026 · Last day to have your say
Decision due
4 Aug 2026 · Target date, often slips
Decided
15 Sept 2026 · Outcome published
Key facts
- Reference
- Ealing/262319CND
- Authority
- Ealing
- Address
- TfL Landholdings At Bollo Lane Acton Ealing Bounded By The Railway Lines To The West Acton Town Station To The North Bollo Lane To The East And The Bollo Lane Level Crossing To The South. London W3 8QU
- Postcode
- W3 8QU
- Type
- Other
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 9 Jun 2026
- Decision due
- 4 Aug 2026
Also happening nearby
Acton Works 130 Bollo Lane Acton W3 8QU
A planning application · counts as major development, so consultation is wider and the decision takes longer
Submission of a Landscape Management Plan pursuant to Condition 20 of planning permission ref: 243527VAR dated 27.06.2025 for 'Material Amendment (s73) to amend the approved plans for re-location of the building within Plot 2F, increase the footprints of Plots 2D-2F to respond to fire safety requirements, increase the maximum AOD height of three buildings within Plots 2D-2E and correct error in topographical survey and amendment to condition 8 to increase the quantum of development within Phase 3 (Plots 2D-2F) from 424 dwellings to 455 dwellings, and increase the business floorspace from 1,776sqm to 1844sqm floor space, as well as resultant amendments to Condition 4 (All Reserved Matters Applications), Condition 5 (Approved Plans), Condition 27 (Overheating and Cooling), Condition 31 (Whole Life Carbon Assessment), Condition 37 (Servicing and Delivery Plan), and Condition 58 (Fire Statement) pursuant to planning permission ref: 201379OUT, dated 22/12/2021 (as amended by Non-Material Amendments ref: 220269NMA, dated 02/02/2022, ref: 234983NMA dated 28/03/2024, and ref: 243393NMA dated 07/10/2024) for 'Hybrid planning application for comprehensive phased redevelopment of the site comprising: Full planning permission for demolition of existing buildings and structures (Phases 1 to 2) to provide up to 550sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 125sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 200 new affordable and market dwellings in a block up to 25 storeys, replacement Train Crew Accommodation (TCA) building, new footway to Bollo Lane, relocated bus stop, new pedestrian crossing, new open and amenity space and associated public realm works. Outline planning permission (Phases 3 to 4) for demolition of existing buildings and structures to provide up to 1,800sqm (GIA) of Business Use Class B1a/b/c floorspace, up to 175sqm (GIA) of flexible commercial Use Classes A1 / A2 / A3 / A4 / A5, up to 700 new affordable and market