High Lane Estate Hobbayne Road Hanwell W7 3RJ
A commercial scheme · counts as major development, so consultation is wider and the decision takes longer
Ealing · Reference Ealing/262599CND
Comment period closed
What is being proposed
Details of demolition method statement/ construction management plan pursuant to condition 19 of planning permission ref: 210009OUT dated 22.03.2023 for 'Hybrid planning application for the comprehensive phased residential led mixed-use redevelopment of the High Lane Estate for up to 53,047 sqm GEA of floorspace, including residential floorspace (Use Class C3) (indicative 505 homes), up to 96 GEA sqm of shop/café floorspace (Use Classes E), up to 95.5 GEA sqm of community floorspace (Use Class F.2), up to 41sqm GEA of substation and an energy centre of up to 207 sqm GEA comprising: Full planning permission for the demolition of existing buildings and structures (Phase 1) to provide residential floorspace (Use Class C3), retail floorspace (Use Class E) and community floorspace (Use Class F.2), cycle and vehicle parking, refuse and recycling storage, highway and access improvements, amenity space, landscape and public realm improvements, an energy centre and a new substation; and, Outline planning permission (Phases 2 and 3) for the demolition of existing buildings and structures to provide residential floorspace (Use Class C3), retail floorspace (Use Class E) and community floorspace (Use Class F.2), cycle and vehicle parking, refuse and recycling storage, highway and access improvements, amenity space, landscape and public realm improvements and a new substation with all matters reserved.'
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Parking pressure
- Boundaries and garden amenity
- Traffic and access
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
29 Jun 2026 · Submitted to the council
Validated
14 Jul 2026 · Checked and published
Comments close
4 Aug 2026 · Last day to have your say
Decision due
8 Sept 2026 · Target date, often slips
Decided
Not yet · Outcome published
Key facts
- Reference
- Ealing/262599CND
- Authority
- Ealing
- Address
- High Lane Estate Hobbayne Road Hanwell W7 3RJ
- Postcode
- W7 3RJ
- Type
- Commercial
- Scale
- Major
- Homes proposed
- 505
- Applicant
- Not published
- Agent
- Not published
- Received
- 29 Jun 2026
- Decision due
- 8 Sept 2026
Also happening nearby
High Lane Estate Hobbayne Road Hanwell W7 3RJ
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Application for a Non-Material Amendment in (S96a) to planning permission 210009OUT dated 22.03.2023 for 'Hybrid planning application for the comprehensive phased residential led mixed-use redevelopment of the High Lane Estate for up to 53,047 sqm GEA of floorspace, including residential floorspace (Use Class C3) (indicative 505 homes), up to 96 GEA sqm of shop/café floorspace (Use Classes E), up to 95.5 GEA sqm of community floorspace (Use Class F.2), up to 41sqm GEA of substation and an energy centre of up to 207 sqm GEA comprising: Full planning permission for the demolition of existing buildings and structures (Phase 1) to provide residential floorspace (Use Class C3), retail floorspace (Use Class E) and community floorspace (Use Class F.2), cycle and vehicle parking, refuse and recycling storage, highway and access improvements, amenity space, landscape and public realm improvements, an energy centre and a new substation; and, Outline planning permission (Phases 2 and 3) for the demolition of existing buildings and structures to provide residential floorspace (Use Class C3), retail floorspace (Use Class E) and community floorspace (Use Class F.2), cycle and vehicle parking, refuse and recycling storage, highway and access improvements, amenity space, landscape and public realm improvements and a new substation with all matters reserved'. Amendments seeks revised demolition plan