2 The Straight Southall UB1 1QX
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Ealing · Reference Ealing/263308CND
Closes today
What is being proposed
Details of validation/verification report in demonstrating completion of the works set out in the Remediation Strategy together with amendments and longer term monitoring part pursuant to Condition 38 (Phase 3 Building G only) of planning permission ref: 171562VAR dated 16/10/2017 for: Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space.
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Loss of open space
- Parking pressure
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
3 Sept 2026 · Submitted to the council
Validated
3 Sept 2026 · Checked and published
Comments close
24 Sept 2026 · Last day to have your say
Decision due
29 Oct 2026 · Target date, often slips
Decided
18 Sept 2026 · Outcome published
Key facts
- Reference
- Ealing/263308CND
- Authority
- Ealing
- Address
- 2 The Straight Southall UB1 1QX
- Postcode
- UB1 1QX
- Type
- Conditions and amendments
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 3 Sept 2026
- Decision due
- 29 Oct 2026
Also happening nearby
The Straight Southall Middlesex UB1 1QX
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Application for a Non-Material Amendment in (S96a) to planning permission 171563VAR dated 16.10.2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road'. Amendment seeks to make alterations to TGQ Phase 2 Buildings F to L with an additional stair core to achieve BS9991 compliance; Buildings I, L and K and I are proposed to increase in height by two storeys each, and become as follows L - 14 storeys, K-10 storeys, I - 14 storeys