Ashton House School 10 Montpelier Road Ealing London W5 2QP London
Work to trees · usually decided quickly and rarely affects neighbours
Ealing · Reference Ealing/P/2007/3796
What is being proposed
T1 - Lime remove
Description as published by Ealing.
What this could mean for you
These are the effects a proposal like this most often raises. Each one is a material planning consideration, so each can form the basis of a comment.
- Trees and landscaping
Derived automatically from the proposal wording. Read the full application before relying on it.
Timeline
Received
16 Aug 2007 · Submitted to the council
Validated
16 Aug 2007 · Checked and published
Comments close
Not yet · Last day to have your say
Decision due
26 Sept 2007 · Target date, often slips
Decided
26 Sept 2007 · Outcome published
Key facts
- Reference
- Ealing/P/2007/3796
- Authority
- Ealing
- Address
- Ashton House School 10 Montpelier Road Ealing London W5 2QP London
- Postcode
- W5 2QP
- Type
- Trees and hedges
- Scale
- Minor
- Applicant
- Not published
- Agent
- Not published
- Received
- 16 Aug 2007
- Decision due
- 26 Sept 2007
Also happening nearby
14 Montpelier Road Ealing W5 2QP
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Application for a Non-Material Amendment in (S96a) seeking to allow drawing amendments in relation to planning permission reference 254721VAR dated 10/02/2026 for: Minor Material Amendment (S.73) to vary condition 2 (approved plans), condition 3 (demolition) and condition 4 (structural method statement), to allow amendment to gable end facade retention, pursuant to planning permission 244581FUL dated 13/05/2025 as varied by 253652NMA dated 09/10/2025 for 'Construction of two storey, six bedroom dwellinghouse including roofspace accommodation (following demolition of existing building with retention of existing front facade); excavation of basement with recreational facilities, courtyard and sunken garden; incorporating rear terraces at first and second floor; restoration works to front elevation; installation of Air Source Heat Pumps within rear garden acoustic enclosure; and other associated works'