Search a London postcode, place, street, council or application reference. Everything here is free to read; an account is only needed for us to watch a place and email you.
We could not place that search
280 results
Work to trees · usually decided quickly and rarely affects neighbours
Pruning of a Cherry tree (T50) and 2no. London Plane trees (T51 and T52), subject to Tree Preservation Order: TPO/56C/4/76; Cherry tree (T50) remove major deadwood over 25mm diameter and/or over 1m length; London Plane trees (T51 and T52) lift crown to give 4m ground clearance all round, prune S side of crown back by around 1.5m to give clearance over flat roof and reduce debris in gutters.
13 days left to comment
A planning application
This is a small (6m x 4m) garden in a private gated mews, i.e. barely visible to the public through the gate. There are multiple trees of varying sizes; only the Cornus, olive, and Pyracantha are big enough to be protected by the conservation area. T1 ornamental Acer. T2 7m tall Cornus: reduce back to previous points, removing 2m regrowth. T3 Camellia. T4 Pyracantha: reduce to previous height of 2.5m, removing 1m regrowth. T5 7m tall olive, dangerous due to crack/split through base of trunk which is not healing: remove. No plans to replant due to overcrowding. T6 Ceanothus. T7 bay.
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Minor material amendment (S.73) to vary new position of bike and bin store pursuant to planning permission reference 231268PANDF dated 14/02/2024 for; Construction of fourth floor to accommodate 9 self-contained residential flats with associated cycle and refuse storage (Prior Approval Application under Class A, Part 20)
Comment period closed
A planning application · counts as major development, so consultation is wider and the decision takes longer
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
Closes tomorrow
Work to trees · usually decided quickly and rarely affects neighbours
T1, T2 and T3 (T0319) - 3x Sycamores, forming one canopy (adjacent Hampton court road) - Reduce overall canopy by 1.5-2m to appropriate growth points, following BS3998 standards. Provide 2m clearance from the house. Remove epicormic growth from the main stem, up to the crown break. Remove all major deadwood of 25mm in diameter and over. The aim of the reduction is to keep the managed at a reasonable size, before a more harsh reduction will be required, and to create a more visually appealing shape.
Work to trees · usually decided quickly and rarely affects neighbours
T1 - Stone Pine Dimensions: Approx 18m Height, N12m, E6m, S8m, W2m. Proposed Works: Remove lowest limb back to the stem. Justification: The tree has a large over-extended lever arm growing to the north-west, roughly 12m in length. It protrudes well outside the line of the rest of the canopy and has been the subject of at least two previous applications, including one rejected by Richmond last year, showing this limb has been a concern to multiple separate arborists over a period of time. Recently a limb above it failed, came down and caused significant damage to the listed boundary wall to Old Palace Yard. The remaining lever arm sits above a busy public footpath with frequent historical tours passing through, a busy roadway and a run of car parking bays. Photographs from only two years ago show a noticeable flattening of the limb since, which adds to our concerns around end loading and mechanical stress at the union. With the failure we have been dealing with, there are no sufficient points left in the tree to brace from. On that basis we believe removal of the limb is the only suitable course of action, and given the target beneath it and the failure that has already occurred and no substantial reduction points.
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Installation of a split outdoor condenser unit; for an air conditioning system (Lawful Development Certificate for a Proposed Development)
A planning application
Installation of an extraction system and flue to rear elevation of a commercial kitchen (Use class E(b); and associated internal alterations
Comment period closed
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Non material amendment to allow the installation of an AC unit on the flat roof of the approved extension of planning permission P/2026/0815 approved 18/03/2026 for the erection of a single storey rear and side wrap around extension with the enlargement of a side and rear roof extension with one front roof window, and removal of side the front porch and chimney to the house..
Comment period closed
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Application for a Non-Material Amendment (S96a) to planning permission ref: 221046FUL dated 27.04.2022 for 'Single storey rear extension and alteration to external rear elevation involving removal and installation of staircase providing entrance to first floor'. Amendments seek to relocate the fire escape walkway
Work to an existing home, single-storey
Single storey infill side extension; single storey rear extension; hard landscaping and ancillary works with accessible external ramp to access main entrance; rear external sheltered walkway linking B01 and B07; alterations to south west elevation fenestrations; alterations to front, side, rear fenestration; alterations to boundary wall; replacement of fence; installation of gate; installation of protection barrier; installation of canopy (Regulation 3 Application by London Borough of Ealing)
Comment period closed
A change of use
Details of external building materials pursuant to condition 3 of planning permission ref: 250037FUL dated 29.04.2025 for: Construction of two storey detached dwellinghouse to the rear of the plot fronting onto North Road (following demolition of existing garage/extension); retention of ground floor commercial space (Use Class E); conversion of first and loft floors into 2 x self-contained flats; roof extension to main rear roofslope; roof extension to rear outrigger; installation of two rooflights to front roofslope; and associate internal and external alterations
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Single storey (max 3.60m deep and max 3.00m high) rear extension (following demolition of existing rear extension) (42 Days Prior Approval Notification Process) (Regulation 3 Application by London Borough of Ealing)
Work to an existing home
Construction of a garage for car parking and storage (following demolition of the existing) and repositioning of steps to flat (part-retrospective)
Comment period closed
A planning application
Details of Full Fibre Connectivity Infrastructure part pursuant to Condition 25 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
Comment period closed
Work to an existing home
Alteration of roof from hip to gable end; rear roof extension; installation of two rooflights to front roofslope; installation of window to side gable
A planning application · counts as major development, so consultation is wider and the decision takes longer
Details of piling method statement pursuant to condition 55 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
Comment period closed
A planning application · counts as major development, so consultation is wider and the decision takes longer
Details of air ventilation system (Ventilation Strategy Report) (part discharge - Phase 1) pursuant to condition 27 of planning permission 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
Comment period closed
A change of use
Conversion of the existing building from ground floor retail unit and 1no. self-contained flat into 1no. retail unit and 4no. self-contained flats; part two, part single storey rear extension with first floor terrace; alteration of roof from hip to gable end, rear roof extension, extending over outrigger, installation of two front rooflights; associated refuse and cycle storage, amenity space; changes to the boundary treatment
Comment period closed
A planning application · counts as major development, so consultation is wider and the decision takes longer
Details of the Ground Remediation part pursuant to condition 43 (part discharge - Phase 1) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.(Regulation 3 Application by London Borough of Ealing)
Comment period closed
Demolition · counts as major development, so consultation is wider and the decision takes longer
Details of circular economy statement post completion report plan pursuant to condition 31 of planning permission Ref: 220545FULR3 dated 23.05.2023 'Development of 92 residential dwellings (Use Class C3) with associated vehicular and pedestrian access across three buildings ranging from two to five storeys in height, children play space, residential amenity space, public realm and landscaping works, a new public open space, vehicle and cycle parking and other associated works. (Following demolition of the existing community centre, school building, playground, MUGA and associated structures) [Regulation 3 Application by London Borough of Ealing]
Comment period closed
A commercial scheme · counts as major development, so consultation is wider and the decision takes longer
Details of post-construction whole life-cycle carbon plan pursuant to condition 30 of planning permission Ref: 220545FULR3 dated 23.05.2023 'Development of 92 residential dwellings (Use Class C3) with associated vehicular and pedestrian access across three buildings ranging from two to five storeys in height, children play space, residential amenity space, public realm and landscaping works, a new public open space, vehicle and cycle parking and other associated works. (Following demolition of the existing community centre, school building, playground, MUGA and associated structures) [Regulation 3 Application by London Borough of Ealing]
Comment period closed
Demolition · counts as major development, so consultation is wider and the decision takes longer
Details of an energy monitoring requirements plan pursuant to condition 28 (Part A only) of planning permission Ref: 220545FULR3 dated 23.05.2023 'Development of 92 residential dwellings (Use Class C3) with associated vehicular and pedestrian access across three buildings ranging from two to five storeys in height, children play space, residential amenity space, public realm and landscaping works, a new public open space, vehicle and cycle parking and other associated works. (Following demolition of the existing community centre, school building, playground, MUGA and associated structures) [Regulation 3 Application by London Borough of Ealing]
Comment period closed
An energy scheme
Internal and external upgrade improvement works of the existing CUE building, replacement of gas boiler with air-to-water source heat pumps, installation of a new mechanical ventilation heat recovery (MVHR), together with new floor insulation, draught proofing, sealing windows, air and box beams vents on the roof, new electrical cables and repairs to external timbers at Horniman Museum, 100 London Road SE23.
A commercial scheme
Proposed New Toilets, Store room with Security, training and caretakers rooms block at the rear N-E corner of Shri Sanatan Mandir Ealing Road, Alperton Wembley HA0 4TA, on behalf of Shri Vallabh Nidhi, UK
Comment period closed
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A change of use
Change of use of th eproperty and forecourt to Car Sales, Building Merchant and Temporary Filming (retrospective)
Comment period closed
Comment period closed
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Loading map…
We add new councils every month. If the area you care about looks quiet, it may not be live yet, tell support which council you need and we will prioritise it.