Search a London postcode, place, street, council or application reference. Everything here is free to read; an account is only needed for us to watch a place and email you.
122 results
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage (PART RETROSPECTIVE).
Comment period closed
A planning application
Replacement of external cladding/soffit panels with non flammable insulation and replacement of UPVC insulation panels with aluminium sandwich panels.
Comment period closed
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) (RETROSPECTIVE).
13 days left to comment
A planning application
Erection of 2 x bungalows, comprising of 1 x bungalow at land adjoining 10 Regal Court and 1 x bungalow at land adjoining 27 Regal Court.
13 days left to comment
A change of use
Change of use from Use Class C3 (dwelling house) to a Class Sui Generis (HMO - house in multiple occupation) involving single storey rear extension, rear dormer to outrigger dormer, front roof lights, with associated amenity, cycle and refuse storage.
Comment period closed
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) (RETROSPECTIVE).
Comment period closed
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Non material amendment to Ref: 22/03346/OUT (as amended by 25/02507/NMA) to allow amendments to the trigger dates wording for condition (F15) Details of Access and Wind Mitigation to Rooftops and Balconies, and condition (H34) Landscape and Ecological Management Plan.
A large housing scheme · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 22/03346/OUT: facing materials (F2) in respect of hybrid planning application (part detailed/part outline) for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive residential-led mixed use redevelopment comprising: Detailed planning application for Phases 0-3 comprising demolition of 12no.existing residential blocks, associated structures and Boundary Hall. Construction of residential and mixed-use buildings providing ground floor flexible commercial floorspace (Use Class E(a, b, c and e)) and community floorspace (Use Class F2(b)), residential dwellings (Use Class C3) with associated road layout, means of access including new pedestrian crossing over Sterling Way, highways works including alterations to junction of College Close and Sterling Way, car and cycle parking, hard and soft landscaping, amenity space, public, communal and private realm, ancillary plant and structures including new substation and associated works. Outline planning application (with all matters reserved) for Phases 4-10 including the demolition of all remaining buildings and structures. Construction of buildings for residential dwellings (Use Class C3), flexible commercial floorspace (Use Class E) including allowance for a drinking establishment (Sui Generis), civic and community floorspace and facilities including temporary re-provision of Boundary Hall (Use Classes F1 and F2) with associated road layout, means of access including new pedestrian walkway connecting to existing bridge to Bridport Road, highways works, car and cycle parking, landscaping including improvements to the boundary of St John and St James Church of England Primary School, amenity space, public, communal and private realm, ancillary plant and structures and other associated works. (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Coun
4 days left to comment
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Non material amendment to Ref: 22/03346/OUT (as amended by 25/02507/NMA and 26/02854/NMA) to allow internal and external alterations to Block D (1 and 2), with amendment to wording of Conditions H3, H6 and F4.
4 days left to comment
Work to an existing home
Rear dormer with rear outrigger dormer, front roof lights and additional windows at side to outrigger dormer.
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class Sui-Generis (HMO-house in multiple occupation) for up to seven persons, single storey rear extension, single storey infill extension, rear dormer with outrigger dormer, and associated amenity, refuse and cycle storage.
Comment period closed
Work to an existing home, single-storey
Single storey rear extension 6m deep x 3m high (3m high to eaves).
Work to an existing home, single-storey
Single storey rear extension, single storey side infill extension, rear dormer, dormer to front roof lights.
A change of use
Change of use from dwelling house (Class C3) to HMO-house in multiple occupation (Class C4 ) for up to six persons, including single storey side infill and rear extension, with rear dormer, rear outrigger dormer and front roof lights, with associated amenity, cycle and refuse storage.
4 days left to comment
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey rear extension, rear dormer to outrigger dormer, front roof lights, with associated amenity, cycle and refuse storage.
Comment period closed
Comment period closed
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey side/rear extension, involving removal of existing rear outbuilding, rear dormer to outrigger dormer, front roof lights, with associated amenity, cycle and refuse storage.
Comment period closed
Work to an existing home, single-storey
Single storey rear extension 6m deep x 3m high (3m high to eaves).
Work to an existing home, single-storey
Single storey side infill extension.
Work to an existing home, single-storey
Single storey rear extension, rear dormer, dormer to rear outrigger and front roof lights.
Work to an existing home, single-storey
Single storey rear extension 6m deep x 3m high (3m high to eaves) and single-storey infill extension 3.1m deep x 3m high (3m high to eaves).
Work to an existing home, single-storey
Single storey rear and infill extension, rear dormer with rear outrigger dormer and front rooflights.
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) involving single storey wraparound extension, rear dormer to outrigger, front roof lights, acoustic fence, with associated amenity, cycle and refuse storage.
Comment period closed
A change of use
Change of use from Use Class C3 (dwelling house) to a Class Sui-Generis (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage involving single storey rear/side extension and rear dormer with outrigger dormer including extension to roof at side.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: biodiversity enhancements (41) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
13 days left to comment
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: landscaping (15) (a) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: landscaping (15)(b) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: green roof details (17) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: construction logistics plan (32) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: landscaping (15c) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details submitted pursuant to reference 24/03918/VAR: electrical vehicle charging points (21) in respect of material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
Comment period closed
A change of use · counts as major development, so consultation is wider and the decision takes longer
Details pursuant to ref: 24/03918/VAR: wind mitigation (55), in respect of Material amendment to 21/04271/RE4 and relevant conditions comprising the following: Removal of the Beck House slab and associated ground works on Upton Road and construction of residential dwellings (Use Class C3) and flexible commercial floorspace (Use Class E), and the change of use of ancillary garages to part of lower ground floor of Scott House (Use Class C3) to provide community hall (Use Class F2(b)), ancillary management office (Use Class C3), along with associated means of access and highways works; car and cycle parking; hard and soft landscaping; play space and public, communal, and private realm; refuse storage; ancillary plant and structures; and works to Scott House to create new access at lower ground and ground floor levels. - Including 135 homes (an addition 1 home); of which 100% affordable by unit (the number of affordable homes will increase from 92 to 135). - Building height ranging from 2 to 6 storeys. Heights revised to a maximum of six storeys. A reduction in height from the 2022 Permission. - Layout composition remains unchanged from the approved scheme. - Simplified floorplans and standardised block shapes and dimensions. - New nursery. - New central community square. - Rationalisation of the Scott House entrance at lower ground floor level with accessible and attractive access. - This Section 73 application does not propose any changes to the approved main works to Scott House. Main works to Scott House are as outlined in the original approved scheme for Upton & Raynham Estate, reference: 21/04271/RE4.
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Non material amendment to 21/04271/RE4 (as amended by 24/03469/NMA, 24/03918/VAR, 25/00556/NMA and 25/00815/NMA) to allow the following: 1) Rationalise the number of brick colours/types. 2) Hung tiles to be changed to brickwork. 3) GRC above window heads to be changed to a contrasting brick maintaining banding and design intent. Brick to be different stretcher or soldier bond. 4) Aluminium copings to all buildings. To be one colour with variation of depths. 5) Omit small areas of GRC below ground floor entrance windows and run brickwork through.
13 days left to comment
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) with associated amenity, cycle and refuse storage (RETROSPECTIVE).
Comment period closed
A change of use
Conversion of dwelling house to 2x self contained flats, involving single storey rear extension.
Comment period closed
Work to an existing home
Rear dormer with rear outrigger dormer and roof lights.
Work to an existing home
Extension to roof at side to form gable end with rear dormer, Juliette balcony, front rooflights and removal of chimneys.
Work to an existing home, 2-storey
Part single, part two storey rear/side extension involving demolition of existing garage/storage extension.
Comment period closed
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) including single storey rear extension involving demolition of existing extension, rear dormer, rear outrigger dormer with front roof lights and associated amenity, cycle and refuse storage.
Comment period closed
A change of use
Change of use from Use Class C3 (dwelling house) to Use Class C4 (HMO-house in multiple occupation) (RETROSPECTIVE).
Comment period closed
A follow-up to an existing permission · the principle is already approved, so only the detail is under consideration
Non-material amendment to Ref: 17/04615/FUL to allow a fire-rated enclosure to the communal staircase to create a protected stair, together with a mechanical smoke shaft serving the dead-end corridor areas, internal layout modifications to accommodate the evacuation lift and associated secondary power supplies, additional changes include the formation of dividing lobbies to the ground floor lift area and upgrades to the bin store and service cupboard doors to provide the required fire-rated enclosures.
Work to an existing home, single-storey
Details submitted pursuant to reference 26/02065/HOU: SuDS (5) in respect of single storey infill extension at rear.
Comment period closed
A change of use
Change of use from dwelling house (Class C3) to HMO-house in multiple occupation (Sui-Generis) for up to seven persons, involving single storey rear and side infill extension with demolition of existing extension, acoustic fence front porch with canopy, rear dormer, rear outrigger dormer with front rooflights and associated amenity, cycle and refuse storage.
Comment period closed
A change of use
Conversion of Use Class C3 (single dwelling house) to Use Class C3(b)
Comment period closed
Comment period closed
Loading map…
We add new councils every month. If the area you care about looks quiet, it may not be live yet, tell support which council you need and we will prioritise it.